| Year | Project | Client | Services |
|
2011
| 450 000 tpy methanol plant | Russia, Shchekino, JSC Shchekinoazot. | Basic Design acceptance. Detail design (authority engineering and detail design documentation). Participation in equipment ordering. Technical assistance during construction and erection. Participation in startup. |
|
2011
| 600 000 tpy methanol plant | Russia, Nizhny Tagil, JSC UralMethanolGroup | Basic design acceptance, authority engineering |
|
2010
| Chikansk gas-condensate field | Russia, Moscow, VNIIGAZ Gazprom | 'Gas Chemical Production Plants' chapter of Investments concept for construction of gas recovery, gas processing/gas chemical semi-commercial complex based on Chikansk gas-condensate field and crteation of methanol and DME plants |
|
2010
| Sobinsk oil-gas-condensate field | Russia, Moscow, VNIIGAZ Gazprom | Development of 'Investments Feasibility Study in creation of gas chemical hydrocarbon complex based on Sobinsk oil-gas-condensate field' included in ammonia, nitric acid (incl. storage), ammonia nitrate, carbamide, methanol and DME production |
|
2010
| Methanol plant | Russia, Gubakha, JSC Metafrax | Process control monitoring of methanol plant operation |
|
2010
| Integrated ammonia-methanol plant (1492 and 668 t/d at integrated production). | Russia, Mendeleevsk, JSC Ammoniy | Basic design acceptance, authority engineering |
|
2009
| Methanol plant | Russia, Veliky Novgorod, JSC Akron | Methanol synthesis catalyst reduction and commissioning of units АСМ-4, АСМ-5 and АСМ-6 |
|
2009
| Methanol plant | Belarus, Grodno, JSC Grodnoazot | Process control monitoring of methanol plant operation |
|
2008
| 160 ths. tpy methanol plant | Russia, Velikiy Novgorod, SC Akron | Feasibility study |
|
2008
| Methanol plant | Russia, Veliky Novgorod, JSC Akron | Methanol catalyst regeneration and putting into operation ASM-7 unit. Process control monitoring of ASM-4, ASM-6 and ASM-7 units operation |