| Year | Project | Client | Services |
|
2010
| Sobinsk oil-gas-condensate field | Russia, Moscow, VNIIGAS Gasprom | Development of 'Investments Feasibility Study in creation of gas chemical hydrocarbon complex based on Sobinsk oil-gas-condensate field' included in ammonia, nitric acid (incl. storage), ammonia nitrate, carbamide, methanol and DME production |
|
2009
| Revamping of urea plant (2A shop) with scaling up to 1500 tpd | Russia, Nevinnomyssk SC Nevinnomysskiy Azot | Increase in total urea plant capacity and supply of new melamine plant with urea solution to produce 50000 tpy of urea |
|
2009
| Construction of drying unit, storage and shipping for converted calcium carbonate in phosphate fertilizer shop | Russia, Rossosh SC Minudobreniya | Unit makeup:double-belt conveyor, drying and pneumatic transport systems. Capacity: 554,4 ths. tpy of dry product. Shipping: Bulk shipment in railway cars 90 - 120 t/h, big-bags 45 t/h |
|
2008
| Urea plant. Revamping of CO2 piston compressors BFV-320 | Russia, Novomoskovsk SC NAK Azot | Scientific-technical support |
|
2007
| Construction of new NPK storage, conveyor gallery, stations for in bulk loading and unloading of mineral wagons and trucks, installation of package equipment (build.203) followed by railway transport shipment | Russia, Rossosh SC Minudobreniyaя» | The storage is a part of unit #3 (phosphate fertilizer shop) purposed to receive, store and load the NPK fertilizers coming from ANP fertilizers plants. Capacity: 60 ths. tons (7 sections). Loading and unloading carried out by belt conveyors |
|
2006
| Urea plant. Construction of concentrated СО2 unit included in two process loops (stage 100) in hydroxyl amine sulphate plant | Russia, Toliyatti SC Kuibyshevazot | Preparation and coordination of works |